Commercial RFQ (NC Seeding Olnly)


Here's what we assume and is provided by the prime.
1. A fire hydrant near the seeding site that you’ve coordinated access to (meter).
2. We will have undelayed access to the site (security pre-coordinated)
3. No requirement for project specific safety or security certifications/training.
4. No requirement for seeding from hose (all work can be executed by cannon).
5. If flaggers/road control are required, they will be privided by the Prime Contractor.
6. Our standard insurance coverage is acceptable.
6. Payment terms are NET 30

Here's what we need to know:
1. Seeding start date
2. Physical address of site
3. Temporary seeded Acreage and specifications
4. Permanent seeded Acreage and specifications

Company Information:


Project Location:


Awarded/Executing Contract


Required RFQ and Seeding Dates


Type of Seeding:

Temporary Seeding

# of acres w/TEMP seeding
Enter # of TEMP Seeding mobilizations
Good Fall/Winter Spec: 150#/A of Rye Grain, 400#/A of 19-19-19, 5 Gal/A of Fast Acting Liquid lime.
Good Spring/Summer Spec: 150#/A of Millet , 400#/A of 19-19-19, 5 Gal/A of Fast Acting Liquid lime.

Permanent Seeding

# of acres w/PERM seeding
Enter # of PERM Seeding mobilizations
EG: 50#/A Hulled Common Bermuda, 6#/A Millet nurse crop, 150#/A Turf Type Tall Fescue, 850#/A 19-19-19 Fert, 2K/A AG Lime

Standard Insurance Coverage

Standard Insurance Coverage:
1: Vehicle Liability: $1,000.000
2: General Liability: $2,000,000
3: Workers Compensation: $1,000,000